Gysin AG, Itingen (BL)

Upgrade/refurbishment of production building

Implementation:

Existing ventilation system on ground floor of production building modernised and extended with air-cooling units, new ventilation system on second floor of production, exhaust air unit with oil mist separator on second floor, chilled-water refrigeration system with air-cooled condenser on roof, hydraulic pipes replaced